HOW TRANSPORT ANIMATONICS ETC.
Animatronics model, theme statues, dinosaur or monster costumes...
How We Transport Big Animatronics
Four steps that assist the prehistoric lifes to your destination.

First Step: Dismantling Works
For big animatronic products delivery, we need to dismantle big dinosaur / animal's legs and tail. Then be available for package.

Third Step: Place Inside Container
After warpping works, we send skilled workers to place all cargos inside the container. All actions are safe and efficient.

Second Step: Package Works
We use air plastic film to package dinosaur / animal's legs, body and tail preserve dust & damage on the way.

Fourth Step: Shipping On Way
Deliver the container to port in China, and arrange shipping schedule. Then, your prehistoric giants are going to you.
How We Transport Single One
Also four steps that assist the product to your destination. Be simple!

First Step: Package Works
We use air plastic film to package whole dinosaur / animal preserve dust & damage on the way.

Third Step: Place Inside Container
After warpping works, we send skilled workers to place single one inside the container. Its shared cargo!

Second Step: Package Inside Crate
Then, we place dinosaur or animal wrapped film inside crate, get better preservation.

Fourth Step: Shipping On Way
Deliver the container to port in China, and arrange shipping schedule. Then, your dino is going to you.
Finalize to Client Exhibiting Site
All are safe, professional and efficient.

No matter what size the dinosaur or animal is, no matter how many products there are, and no matter what shape it is, we can safely and professionally deliver it to the customer's destination.
All the goods we transport have been insured. Customers can rest assured that the goods will be delivered safely.
Generally speaking, the shipping time for sea transportation is 14 to 50 days (depending on the specific location of your port). The air freight time is approximately 7 to 10 days. And for railway transportation (for the Eurasian continent), it takes around 10 to 14 days.
Installation Services
Provide best installing team or tutorial based on client requirements.